123
02
PRACTICE MISSIONengineering design and iteration
engineering design and iteration
Prototype A succeeds 9/10 times at 28 N; B succeeds 8/10 at 16 N; requirement is >=8/10 and <=20 N. Which passes?
MODELTested Prototype
CODE 9
PROVEChoose with evidence
CLUE
Use the scaffold, but make each step earn its place.